Metal 3D printing is currently dominated by powder-based techniques like SLM (Selective Laser Melting). These processes yield incredibly precise parts, but the build times are slow. Furthermore, dealing with the powder increases manufacturing complexity: Whenever the powder is transported, loaded into the machine, or cleaned up afterwards, rigorous steps must
$150,000 thousand. Still expensive none the less
You just called it 150 million again because what you typed reads as “150 thousand thousand”
You’re right. Not sure why I wrote it that way