• @bleistift2@sopuli.xyz
    link
    fedilink
    English
    783 days ago

    Teach this to your manager: At the beginning of a task, uncertainty is highest. Under no circumstances should you give an estimate in ‘man-hours’. Even days is too precise. The first estimate should be in months or years (of course depending on the size of the project). Then, as your insight into the project grows, you refine that to months, then weeks, later days. A vague estimate with a lower and a higher bound is way more useful to your manager than a ridiculously ‘precise’ but highly speculative number.

    This lesson was brought to you by either “Code Complete 2” or “Rapid Development” by Steve McConnel, and by my former manager who wanted projects estimated in minutes.

  • @tea
    link
    583 days ago

    Don’t forget to add padding, so I’d just round it out to 18 months to be safe.

  • HubertManne
    link
    fedilink
    393 days ago

    this is my number one thing I hate. So we are going to be converting over one system to another and you have no ideas what issues will pop up. give an estimation on the project. or like estimation onf fixing a bug or doing something you think the software can do but your not real sure till you look into it.

    • Malgas
      link
      fedilink
      English
      112 days ago

      Hofstadter’s Law: It always takes longer than you think, even when you take into account Hofstadter’s Law.

    • @nous@programming.dev
      link
      fedilink
      English
      62 days ago

      The known unknowns and especially the unknown unknowns never get factored into an estimate. People only ever think about the happy path, if everything goes right. But that rarely every happens so estimates are always widely off.

      The book How Big Things Get Done describes a much better way to factor in everything without knowing all the unknowns though - Just look a previous similar projects and look how long they took, take the average and bounds then adjust up or down if you have good reason to do so. Your project will very likely take a similar amount of time if your samples are similar in nature to your current task. And the actual time already factors in all the issues and problems encountered and even if you don’t hit all the same issues your problems will likely take a similar amount of time. And the more previous examples you have the better these estimates get.

      But instead of that we just pluck numbers out of the air and wonder why we never hit them.

      • HubertManne
        link
        fedilink
        22 days ago

        yeah I have literally had something where I list off a bunch of problmatic stuff and how it could be some high side and then follow up or everything could go swimmingly which never happens and we could have this low side and they are like ok so the low side. no. no. that is not what im saying.

  • @zante@lemmy.wtf
    link
    fedilink
    English
    43
    edit-2
    3 days ago

    A good project manager doubles your number an adds 20% anyway.

    Triples it if you are working more than one project.!

    • NotAnOnionAtAll
      link
      fedilink
      163 days ago

      A typical project manager will get a range, take the lower bound and communicate it as the only relevant number to every other stakeholder. When that inevitably does not work out, all the blame will be passed on to you unfiltered.

      Depending on where you work it may or may not be worth giving someone new the benefit of the doubt, but in general it is safer to only ever talk about the upper bound and add some padding.

      • I hear this criticism all the time, but I’ve never seen it happen in 5 companies I’ve worked for so far. Usually there’s an understanding that estimates are wild guessing, and things are planned using dependencies rather than timeliness.

      • @zante@lemmy.wtf
        link
        fedilink
        English
        33 days ago

        Only novice PMs do that and believe it or not, the project manager carries the can for failure .

    • @mosiacmango@lemm.ee
      link
      fedilink
      12
      edit-2
      3 days ago

      My teams new hire project manager was even more advanced. When they found out we were working on 5-10 projects at once with no PM, they quit.

      We had 3 PMs when I started here, and have been down to 0-1 for 6 months. That 0-1 runs a whole unrelated team, but is technical still a PM.

      Dysfunction is fun. The plus side? No one asks me for estimates.

      • @Kojichan@lemmy.world
        link
        fedilink
        22 days ago

        Wow. I just lost mine. Been through at least 5 so far… Of course I’m working on around 6 projects at any point.

        My favourite was when I migrated a website to Plesk, and my boss wondered why it took me 8 hours to migrate a single website…

    • @bleistift2@sopuli.xyz
      link
      fedilink
      English
      113 days ago

      My manager once accused me of overinflating my (granted, very conservative) estimates just to be able to pull off a Scotty and be early in 10% of the time.

      • Snot Flickerman
        link
        fedilink
        English
        8
        edit-2
        3 days ago

        I don’t know, that mindset is so foreign to me. If someone was overestimating how long it would take because they were simply trying to be conservative and not run into unexpected cost overruns, I would commend them. I’ve always considered it more prudent to expect something to take longer so you know the kind of budget you need up front instead of lying to yourself about it. It costs a lot more (in terms of lost time and productivity) to have to swing a new budget mid-project because it turns out you’ve burned through the planned budget and you’re only 2/3 the way done with the project.

        So, screw your manager, you’re doing the right thing, in my eyes. I guess that’s why I’m not in charge of anything.

    • @frezik@midwest.social
      link
      fedilink
      02 days ago

      You know, maybe we shouldn’t be taking estimation advice from a 1980s science fiction movie that amounts to a systematic method of lying.

      Yes, I’ve used it before. Yes, you can hopefully have everything average out in the end. Yes, project managers demand estimates. None of these are good reasons to back up how fundamentally flawed it is.

      • Snot Flickerman
        link
        fedilink
        English
        22 days ago

        It’s called a joke. We’re in a sub called “programmer humor.” You must be fun at parties.

        • @frezik@midwest.social
          link
          fedilink
          1
          edit-2
          2 days ago

          Except people take that method seriously all the time. All the objections I raised were one’s people have actually thrown back at me.

          I’m tons of fun at parties. Everybody loves seeing my collection of bottles from defunct soda companies.

          • Snot Flickerman
            link
            fedilink
            English
            12 days ago

            Ah, yes, my favorite activity at parties, looking at some weirdos trash collection.

            • CodandChips
              link
              fedilink
              22 days ago

              Hey, if you’re anywhere in the area, I’ve got fine collection of IKEA allen keys a

  • @MonkderVierte@lemmy.ml
    link
    fedilink
    20
    edit-2
    2 days ago

    My boss asking, me: “2 days to a week”.

    Meaning: 2 days best case scenario, but there’s likely something where i’m stuck for days trying to solve it, so a week.

    My boss: “ok, two days then.”

  • @phorq@lemmy.ml
    link
    fedilink
    Español
    53 days ago

    That’s because all tasks finish in the dot of the “i” of the Jeremy Bearimy sprint, I dunno what to tell you…