• Nomecks
    link
    fedilink
    271 month ago

    Because of nuclear non-proloferation treaties. You can’t run a “recycling” program without also being able to make plutonium for bombs.

    • @cordlesslamp
      link
      4
      edit-2
      1 month ago

      Just let the government do it then. All nuclear waste should/must be handled and recycled by the state.

      It’s not like they don’t have nuclear bomb or plutonium already.

      • sunzu2
        link
        fedilink
        101 month ago

        Nahh duck that. Give 50 billion to some corporation to do the job.

        Trust me bro, it works every time to make some dude rich

    • @acosmichippo@lemmy.world
      link
      fedilink
      English
      2
      edit-2
      1 month ago

      You can’t run a “recycling” program without also being able to make plutonium for bombs.

      But you need far more enrichment for weapons grade plutonium than you do for commercial fuel plutonium. In fact, the more we use plutonium for fuel, the less nuclear waste there will be available to potentially be recycled into weapons grade plutonium in the future. There would also be less potent waste to be stored long term which is why Japan reprocesses.

      And other countries are reprocessing, including Russia and China, so I don’t see how US holding back is helping non-proliferation anyway.

  • @givesomefucks@lemmy.world
    link
    fedilink
    English
    81 month ago

    We do…

    The US military sells our “spent” fuel to France who refines it and uses it.

    Why do people always want to learn about nuclear energy from YouTube videos made by teenagers with no clue how nuclear power works?

    • @acosmichippo@lemmy.world
      link
      fedilink
      English
      11 month ago

      how much though? I was under the impression that the vast majority of US nuclear fuel is “once through” and the waste goes into long term storage.

    • Diplomjodler
      link
      fedilink
      11 month ago

      Oh really?

      For its part, the US Energy Department, which owns almost 50 tons of excess Cold War plutonium, contracted with the French government-owned nuclear-fuel cycle company, Areva (now Orano), in 2008 to build a MOX fuel fabrication plant. But the United States switched to a “dilute and dispose” policy for its excess plutonium in 2017 after the estimated cost of the MOX plant grew from $2.7 billion to $17 billion.

      Source

      • @givesomefucks@lemmy.world
        link
        fedilink
        English
        01 month ago

        That does have most of the same words, so I could see why a search engine thought it was relevant…

        But did you read it? Even just the part you quoted?

        Like, that’s talking about cold war plutonium…

        That’s not what used military reactor fuel is…

  • @Fizz@lemmy.nz
    link
    fedilink
    11 month ago

    Its not taking up much space, we don’t really need to reuse it at the moment.

  • Diplomjodler
    link
    fedilink
    -101 month ago

    Because the technology does not exist and would be prohibitively expensive to develop even if we got it to work at all.

    • @un_aristocrate@jlai.lu
      link
      fedilink
      Français
      21 month ago

      You’re being down voted because the theology does exist and is being used, as illustrated by the video.