• @tal
    link
    English
    73 months ago

    It probably isn’t right now because interest rates are high.

    NuScale’s project a bit back got cancelled after they skyrocketed.

    Nuclear power plants have a big up-front cost and then provide a return over a long period of time. So how much it costs to get that capital is really important.

    • partial_accumen
      link
      fedilink
      153 months ago

      Nuclear power plants have a big up-front cost and then provide a return over a long period of time

      It appears the problem is a bit worse than that. Its a big up-front cost, then expensive operation, which means high prices to consumers for electricity generated by nuclear power compared to other power generation methods. Its the reason the plant was shut down in 2022.

      “Entergy explained, “market conditions have changed substantially, and more economic alternatives are now available to provide reliable power to the region.”” source

      So how eager are consumers to having their electricity bills go up to support nuclear power? Those in Georgia are feeling this on their electric bills with their additional reactors finally online:

      “Bills went up $5 this month after Unit 3 entered commercial operation. That’s atop a $16-a-month increase to pay for higher fuel costs two months ago. There was also an increase in base rates early this year, with another scheduled next year.” source

      So contrasting the Michigan plant, which is being restarted from cold, the Georgia plant which represents some new construction of reactors, Ohio electricity bills went up with a surcharge to subsidize two unprofitable nuclear plants.

      “Bail out two nuclear plants: From 2021 until 2027, Ohio ratepayers will pay a new monthly surcharge on their electricity bills, from 85 cents for residential customers up to $2,400 for big industrial customers. The surcharge will produce about $170 million a year; $150 million of that will be used by the utility FirstEnergy Solutions to subsidize its two big nuclear power plants — Davis-Besse, outside of Toledo, and Perry, northeast of Cleveland — which it claims are losing money and will be closed in the next couple of years without bailouts” source

      …Except Ohio is even worse than you think. The power company bribed the Republican Speaker of the House to get this legislation passed. After it was found out he’s now in prison for 20 years. source

      …However, the corrupt legislation his bribery got signed into law still stand on the books today and Ohioans continue to literally pay for this corrupt action to subsidize these unprofitable nuclear plants.

      As much as I like the zero-carbon electricity, nuclear is pretty darn expensive for what you get. You’ll open your wallet to pay for it, whether you want to or not.