• Viper_NZ@lemmy.nz
    link
    fedilink
    English
    arrow-up
    1
    ·
    7 months ago

    I have a front loader that takes anything from 1.5 - 3 hours depending on water temperature, load size etc.

    It may tell me 2 hours when I start it, and still be going 2 hours 20 minutes later.

    The dryer next to it is even worse when it comes to guessing duration, so having a notification pop up next to me is helpful.