Stenciling says “6 & 7TH / PDE & 3RD” It’s the only pink tie on this track.

  • markstos@lemmy.world
    link
    fedilink
    English
    arrow-up
    37
    arrow-down
    1
    ·
    9 个月前

    It’s marking the joint between two track segments. Look just above it. On both tracks there’s a series of bolts indicating that two track segments have been bolted together.

    Not sure why the other joints aren’t marked.

    • perviouslyiner@lemmy.world
      link
      fedilink
      English
      arrow-up
      12
      ·
      edit-2
      9 个月前

      if that was an insulated joint for track circuit separation there would be cables attached at each side and the two bolted plates would be aligned?

      • Darkassassin07@lemmy.ca
        link
        fedilink
        English
        arrow-up
        12
        ·
        9 个月前

        You can see 3-4 wires connected on either side of the plates.

        I’m not sure if those particular plates are insulating connections though. Doesn’t really look like it, but I’m no expert on rail connections.

        • perviouslyiner@lemmy.world
          link
          fedilink
          English
          arrow-up
          4
          ·
          edit-2
          9 个月前

          good spot, those wires are smaller than I am used to seeing - so it is a track circuit boundary as well as whatever the pink means.

    • chaogomu@kbin.social
      link
      fedilink
      arrow-up
      11
      ·
      9 个月前

      Rail is most often welded together, not joined like this.

      So you likely don’t need more than one marking.