• Lumiluz@slrpnk.net
    link
    fedilink
    English
    arrow-up
    4
    ·
    11 hours ago

    That depends where the concrete was going to be used. On the first floor of a multi floor building? Will probably cause some structural issues after it’s nearly build or fully built.

    • LovableSidekick@lemmy.world
      link
      fedilink
      English
      arrow-up
      6
      ·
      11 hours ago

      So if you want to sabotage a building, the idea would be to get a job where you’re assigned to haul the wheelbarrow full of concrete to the back of the jobsite or drag the end of the chute to where it’s going to dump out, so you know exactly where that ton of concrete is going. Then you surreptitiously pour out a couple pounds of sugar from your orange vest or fake beer gut and stir it around with a trowel without arousing suspicion. Zoidberg takes notes: “surrep…titiously…”