• Glitterbomb@lemmy.world
    link
    fedilink
    arrow-up
    3
    ·
    5 hours ago

    So one thing Ive seen when they go to pour concrete they always fill up like a coffee can of what they pour as a sample. That sample sets quicker than the rest and they send that to a shop that beats the hell out of those coffee can shaped logs of concrete. If it doesn’t stand up to those tests they alert the construction and the concrete is removed and redone. At least that’s my understanding.

    So maybe straight in the mixer isn’t the best. It would show up in the tests and they’d be onto it quickly.

    But maybe that’s just how my minecraft modpack works

    • GoodLuckToFriends
      link
      fedilink
      English
      arrow-up
      2
      ·
      5 hours ago

      Are they only coffee can sized now? My buddy did a stint as a grunt with an engineering firm where all he did was load those things into a crusher and document how they broke, and the logs were more like human torso sized.