- cross-posted to:
- georgia@lemmy.world
- cross-posted to:
- georgia@lemmy.world
First U.S. nuclear reactor built from scratch in decades enters commercial operation in Georgia::ATLANTA — A new reactor at a nuclear power plant in Georgia has entered commercial operation, becoming the first new American reactor built from scratch in decades.
The cost of storing nuclear waste for a running plant is only a few hundred thousand a year; basically just just salary for a few people to transport it to a big hole in the ground.
Decommissioning costs a few hundred million, which sounds like a lot, but for a project that lasts for decades it’s basically nothing.
You could probably fit all of the nuclear waste America produces in few trucks. It’s not as much as people think.
Those must be some big fucking trucks. And as far as I know, only Finland has actually developed any long-term storage which could be considered safe.
Nuclear is fine, but nuclear fanboi takes are similar to weed fanbois, it’s not a perfect solution.
You seem to think a big number means a big pile of green goo. But actually…
Here is the entire volume of high-level, long-lived waste that France needs to store over the long term for 80 years of nuclear power (with 70%+ nuclear power in its electricity mix).
The question of nuclear waste, hammered home by the anti-nuclear crowd, has long since been answered. And the answer is: it’s far from being a problem.
As for the cost of storage and decommissioning, it makes no sense if we do not give a financial order of magnitude.
At French current electricity price, a 915MW reactor will produce 1.1 billion euros of electricity over one year. A 1500MW reactor will produce 1.8 billion euros of electricity over one year.
When you sell 60 billions of euros worth of electricity per year for 60 years, even if you pay 50 billions for storage and 2 billions to decommission an entire plant, it’s still quite profitable.
Or even less if we – gasp, shock, horror! – reprocessed it.
(We don’t do that because of overblown fears about nuclear weapons proliferation.)
Estimated total cost of decommissioning in the UK is £120bn. But it’s going to take 100 years to do it… so yay lots of rotting radioactive buildings for the next century.
The nuclear waste storage facility cost 53bn to build, let alone run… so way off your ‘few hundred thousand a year’.
That’s for way more than just one plant, and there’s a lot more going on that resulted in such a high price tag. That isn’t normal.
It’s a reinforced hole in the ground, designed to last a long, long time after humans forget it exists. Of course it cost money to build, but now it’s just there. It doesn’t cost anything for it to continue to exist. Maybe there’s a little security or staff for some purpose, but I don’t know what they would even do.
No, that’s pretty normal. Current experience with decommissioning German nuclear power plants show that the cost is about $1.2 billion per power plant, and that decommissioning takes about 20 years.
That doesn’t mean you simply get to ignore the $53 billion it cost to dig that hole.