[T]he report’s executive summary certainly gets to the heart of their findings.

“The rhetoric from small modular reactor (SMR) advocates is loud and persistent: This time will be different because the cost overruns and schedule delays that have plagued large reactor construction projects will not be repeated with the new designs,” says the report. “But the few SMRs that have been built (or have been started) paint a different picture – one that looks startlingly similar to the past. Significant construction delays are still the norm and costs have continued to climb.”

  • MudMan
    link
    fedilink
    930 days ago

    You keep doing the thing. The thing sucks. Please stop.

    For one, no, that’s not how that works. Money is already being spent in energy generation, mostly towards oil and gas. This isn’t your weekly takeout budget.

    It’s also not a race towards infinite energy where you dump money to make the infinite energy bar go up. Energy generation will continue to be costly and have problems, regardless of the mix of options chosen. There is simply no single silver bullet. Which is, presumably why we already don’t go “all-in” on one energy source, which is just about the dumbest possible plan. Energy diversification is absolutely part of this, regardless of where the majority of the output is coming from.

    So please stop it. Genuinely stop it. This isn’t a zero sum game, it’s about finding the mix of energy sources that gets you less killed in the next century or so. Not finding a single source, not backing a single winning horse, not having your stupid team you support for either dumb Internet reasons or disingenuous trolling reasons win.

    • @areyouevenreal@lemm.ee
      link
      fedilink
      English
      329 days ago

      If we are thinking of the next century then these discussions are very relevant. A century is a long time. We don’t actually have that long for some of these problems though.