• Fuck spez
    link
    fedilink
    English
    28 months ago

    Thanks, that’s encouraging. So is it the roof construction, grid connectivity, or both that requires permits?

    • @SirEDCaLot
      link
      English
      28 months ago

      Construction, electrical work, grid connection, sometimes architectural review to ensure the result isn’t ugly, etc etc